The exclusive AU /Japan distriibutor
GALICAN range of products moved website to:
https://www.galican-au.com
GALICAN - Full Grip Tunnel
4, 6m In stock inc, gst
1m: $330.00 (out of stock)
2m: $400.00 (out of stock)
3m: $475.00 (out of stock)
4m: $595.00 (Yellow w/Blue)
5m: $700.00 (Yellow w/Blue, Blue w/purple/yellow)
6m: $765.00 (Yellow w/Blue)
4735-ficha_btt.jpg | 4733-ficha_btt.jpg | 4736-ficha_btt.jpg |
---|---|---|
4734-ficha_btt.jpg | 4730-ficha_btt.jpg | Full Grip tunnel blue |
Wire spiral close up | IMG_3515 | Full grip Tunnel |
375445493_211634391668582_5209160533502171813_n | 376362795_1798517937274359_7607776460005913524_n | 376366586_833377391836865_9016634575869126925_n |
IMG_3514 | 4731-ficha_btt.jpg | 4728-ficha_btt.jpg |
4729-ficha_btt.jpg | 4732-ficha_btt.jpg | 4554-ficha_btt |
4556-ficha_btt | Fabric close up | 4555-ficha_btt |
Are you and your dogs hard on tunnels? NO PROBLEM!!
Exceptional Grip, Very resistant to deformation and maintain it's roundness even very heavy saddlebags.
Actual product may vary slightly
-
Tunnels are suitable for both ANKC and ADAA Agility specifications.
-
High-grade embossed texture fabric creates great traction for speed.
-
Highly recommend using WIDE triangle shaped saddlebags and at least one per meter to maximize tunnel stability and anti-slip performance.
Trim close up
Specifications:
Anti- Slip fabric is PVC coated Polyester (1100 dtex)
Anti-slip fabric weight: 700gsm.
Gripping texture depth: 500um
Pitch: 150mm.
Wire trim: Black rubber, wire end is protected.
Length: 1 to 6meter available.
Thick Spring wire is covered by a black rubber makes the tunnel
very resistant to defamation and maintains
Tunnel weight :
Weight in 6m: 25k
Available colours: Yellow, Blue, Red, Pink, Purple
Notice instructions:
-
Before shrinking to its original position the tunnel should be thoroughly cleaned (in the stretched position) with a damp cloth using water or a soapy water (don't use chemical agents). When shrinking to its original position the tunnel should always be dry. If the weather conditions remained the tunnel wet after shrinking to its original position, it is necessary to stretch it and dry.
-
In the winter time, it is necessary to put the new tunnel into a warm room (min. +5C) for 24 hours before unpacking and stretching.